PF are experienced in the inspection and assessment, strengthening, refurbishment and detailed design of bridges comprising many different structural forms and materials.
As a result of our extensive work on bridge structures, we developed the Modular Bridge Deck, a fast, efficient and versatile means of constructing either a temporary or permanent bridge deck.
The Wellington Street Swingbridge
Refurbishment Project
2007 - Commendation