Damang Goldmine Railways, Ghana

SectorSector: Rail

CostCost: 8000000

ClientClient: Abosso Goldfields Ltd.

locationLocation: Ghana

project DetailsProject Details

Feasibility study of a 12km diversion of the railway line connecting Accra with the principal port Takoradi. This project to divert the railway line was required to circumvent a proposed open-cast goldmine at Demang. The feasibility study was followed up with the detailed design for the infrastructure which included extensive earthworks, drainage, trackwork, a new station halt with storage siding and a new bridge over a river.