Rudbar Lorestan Hydro Electric Project, Iran

SectorSector: Power

CostCost: 580000000

ClientClient: Iran Water & Power Resources Development Co (IWPC)

locationLocation: Iran

project DetailsProject Details

Design, technical specifications and tender documentation for all the mechanical and electrical aspects of this project. This scheme, which located in the Zargos Mountains in Iran, includes a concrete gravity dam, a head race tunnel, twin surface penstocks and a power house with an installation capacity of 450 MW.