Rudbar Lorestan Hydro Electric Project, Iran
Sector: Power
Cost: 580000000
Client: Iran Water & Power Resources Development Co (IWPC)
Location: Iran
Project Details
Design, technical specifications and tender documentation for all the mechanical and electrical aspects of this project. This scheme, which located in the Zargos Mountains in Iran, includes a concrete gravity dam, a head race tunnel, twin surface penstocks and a power house with an installation capacity of 450 MW.

