N Sele SEZ, DR Congo
Sector: Land Development & Regeneration
Cost: 50000
Client: IFC
Location: DR Congo
Project Details
Assessment and review of a 3,000-hectare site in N’Sele near Kinshasa. The site is being developed through a detailed feasibility study involving site assessment of the existing infrastructure. The work includes determining the basic natural geographical and physical characteristics, major on-site and off-site infrastructure, and utilities infrastructure services. This initial first stage study will lead to the development of a masterplan in Stage 2.

