Filter Projects
Projects

Sector: Bridges
Cost: £140,000,000
Client: Network Rail
Location: Scotland, UK
In 1995 Pell Frischmann we were commissioned by Network Rail (formerly Railtrack) with regard the structural integrity of the Forth Bridge. The Forth Bridge is a Category A Listed structure and an iconic bridge that draws many tourists. As such it was imperative that any required works identified should be the minimum possible with regard visual impact. We inspected structural members, using rope access rather than scaffold, to verify member dimension, section sizes and condition. This information was then used to model the structure and determine member forces. read more

Sector: Ports & Harbours
Cost: Rs. 7,500 million
Client: Gujarat Chemical Port Terminal Company Limited
Location: India
Appointed for Phases 1 and 2. Involved in a due diligence of the development cost of an integrated port and storage facility. read more

Sector: Pell Frischmann Brown Beech - Long-Span Bridges
Cost: Confidential
Client:
Location: Portugal
The original suspension bridge, which was completed in 1966, was upgraded to carry a train track through the truss deck and expand the carriageway from five lanes to six lanes. The bridge is a suspension bridge with steel truss deck and steel towers. Cables are constructed from steel wire with concrete gravity anchors. read more

Sector: Pell Frischmann Brown Beech - Long-Span Bridges
Cost: Confidential
Client: Stretto di Messina SpA
Location: Italy
The Messina Crossing joins the island of Sicily to mainland Italy. The proposed bridge is designed to carry road and rail and will replace the existing ferries. Messina is a suspension bridge which when completed will be the longest suspension bridge in the world, with a main span of 3,300m. We were responsible for the concept design of the bridge. read more

Sector: Pell Frischmann Brown Beech - Long-Span Bridges
Cost: Confidential
Client: Turkish Highways Authority (KGM)
Location: Turkey
Increasing volumes of traffic over the first Bosphorus Bridge resulted a in a decision to construct a new suspension structure 5KM from the original bridge. It is a toll bridge, and a toll plaza with toll booths is situated before the bridge on the European side. Toll is paid for one way passing from the European side to the Asian side. read more
